Malaysia: Electrified Double Track from ‘Gemas to Yohor Bahru’: DEPOT GEMAS
For the Mainline: As Built Design for Mainline and Stations continues, following completion of track installations. For Gemas Depot: Alignment, Permanent Way and Track Drainage System for the ETS Maintenance Depot with the facilities for Washing Plant, Stabling Tracks connected to Gemas Station.
2021-2022
Malaysia: Electrified Double Track from ‘Gemas to Yohor Bahru’ : DEPOT KEMPAS
For the Mainline: Preliminary, Intermediate and Final Design of Alignment including Cut and Slews and TTD (Temporary Track Diversion). For the Kempas Depot: Alignment and Design of Permanent Way and Track Drainage System for the ETS Maintenance Depot with the facilities for Washing Plant, Stabling Tracks as well as Permanent Way, Signalling, Communication and Ole Building connected to Kempas Station.
2020-continuing
Malaysia: Electrified Double Track from ‘Gemas to Yohor Bahru’
Upgrading a single-track line under operation to a double-track electrified line. Preliminary, Intermediate and Final Design of Alignment and Permanent Way including Cut and Slews and TTD (Temporary Track Diversion).
2019-continuing
Metro Baku Azerbaijan Track System Exchange Concept
Exchange of the existing track system with wooden sleeper embedded in concrete with the new Vollert Rheda Slab Track System without interruption of revenue services. Alignment for 2 Depot tunnel access tracks with the new Vollert Rheda Slab Track System.
2018-continuing
Malaysia: Electrified Double Track from 'Gemas to Johor Bahru'
Technical assistance for alignment and final design engineering and trackwork design in the consortium for the Construction Joint-Venture. Depot Kempas final alignment and drainage design.
2017
German Railways DB / Section Größnitz-Crimmitschau
Alignment engineering as subcontractor, submission of alignment documents and trackwork construction documents for approval by the Authorities concerned for open track and station sections
2016-2017
Extension of Metro Baku Azerbaijan
Management, design and introduction of the new slab track design Vollert Rheda Slab Track System for Metro Baku tunnels and depot test track as well as 2 stations and tunnel tracks with crossover.
2014-2016
South African Railways PRASA / Siyaya
‘Asset Rehabilitation Program’ for railway line improvement in Gauteng, Cape Town and Durban Region with upgrade to 120 Km/h based on flight maps
2012-2014
International Public Transport Projects
Participation in several Metro Line- and LRT Tender-Follow-Up for Depot Projects and Track Alignment Design for workshops
2010-2012
Delhi Metro Airport Express Line - DAMEL Project
Basic-, Detailed Design of this Airport Link Project of app. 20 km Slab Track System in tunnels and on viaducts for the local Construction Consortium
2005-2011
Taiwan Taoyuan int’l Airport Access MRT Construction Project TTY Project
Track work design (Outline- Detailed-Manufacturing Design), Slab Track system for 54 km double track MRT-System with Slab Track in tunnel and on viaducts and two depots in ballasted Track. The slab system includes 20 sections of sensitive areas to be protected by particular noise and vibration reduction track systems as floating slab (Light Spring Mass System LSMS and Heavy Spring Mass System SMS) on behalf of the Track-Construction- Joint-Venture in the Consortium for TTY Project
2002-2005
New High Speed Line ‘Taipei – Kaohsiung‘
Slab Track system in Rheda 2000 for track and 134 high speed turnouts in the stations; Preliminary-, Intermediate- and Final Design for these track sections for the Construction Consortium
2002-2004
New Railway Underground Lines crossing the City of Berlin including the new Central Station of Berlin North-South
Layout design for 56 turnouts on floating slab and about 20 km Floating Slab Track for the Construction Consortium
1999-2004
New High Speed Line Nuernberg–Ingolstadt, Section ‘Fischbach/Feucht’
Preliminary-, Intermediate- and Detailed Design of Rheda 2000 Slab Track System for the construction company
1999-2004
New Dutch High Speed Line Amsterdam – Paris, ‘HSL Zuid Netherlands’
System Design for Slab Track and turnouts, Detailed Design for turnouts in Slab Track on special substructures for the Construction Consortium
1998
New Central Station of Berlin East-West-Connection ‘Lehrter Bahnhof’
Preliminary Design, and Detailed Design of the Permanent Works in the new Central Station of Berlin for the Construction Company
1997
New Central Stationof Berlin East-West-Connection (‘Lehrter Bahnhof’), Transitions
Feasibility Study, Design and Final Design for the Transitions of existing lines to the new Station Lines
1997
Section ‘Naumburg - Leislingen'
Preliminary Design, Design, Detailed Design, realignment section with Slab Track for the Construction Company
1997
Alignment under special aspects of ‘Slab Track’
System studies on realized and running Projects: Influences of adapted Alignment parameters by using Slab Track and Floating Slab Track; Singapore Metro (MRTS 1986) and Bangkok Metro (MRTA 1997)
1997
Station 'Ostkreuz'
Crossing East-West lines and North-South lines in the East of Berlin: Statement on Projects of redesign of the station and Study of alternative alignments for the Design Group
1996-1997
System design for Permanent Way in Slab Track
High Speed Line 'Hanover-Berlin ‘Wustermark’,
High Speed Line 'Cologne-Rhine/Main, Sec. ‘Frankfort-Airport’,
High Speed Line 'Cologne-Rhine/Main, Sec. B,
for the Construction Consortium
High Speed Line 'Cologne-Rhine/Main, Sec. ‘Frankfort-Airport’,
High Speed Line 'Cologne-Rhine/Main, Sec. B,
for the Construction Consortium
1996-1997
Regional Rapid Transit - 'Stadtbahn Berlin'
Preliminary Design and Final Design of track work in Slab Track for the ICE Lines, Reconstruction of Ballasted Track to Slab Track for the Construction Consortium
1996
Transformation into Limited Liability Company
Juergen Radermacher, Dipl.-Ing. Buero fuer Verkehrsingenieurbau GmbH
1995-1996
New High Speed ‘Line Cologne – Frankfurt‘
Supplementary study of project during tendering phase in respect of permanent way in Slab Track on viaducts, on embankment and in tunnels, Lot B
1995-1996
High Speed Line 'Cologne - Rhine/Main'
During Tendering Phase in respect of Permanent Way in Slab Track
1994-1995
Regional Rapid Transit - S-Bahn 'Stadtbahn Berlin'
Design and Final Design of Slab Track System for reconstruction of Ballasted Track to Slab Track for the Construction Consortium
1992-1994
Railways in the Center of Berlin - Station 'Berlin Sued'
Realignment and new Railway Lines in the Center of Berlin, Section South for the Design Group
1992
Formation of the Company
Juergen Radermacher, Dipl.-Ing. Buero fuer Verkehrsingenieurbau